Skip to content

Schedule ​

Schedule is a builder parameter that enables automatic report runs at a set frequency. Without a schedule, a report only runs manually.

Step-by-step instructions ​

1. Open schedule settings ​

In the builder, go to the Output > Schedule section.

2. Enable the schedule ​

Turn on the Enable schedule toggle.

3. Choose the frequency ​

Available options:

  • Hourly — runs every hour on the hour (XX:00)
  • Daily — runs once a day at a specified time
  • Weekly — runs on specific days of the week at a specified time

4. Configure the run time ​

For daily and weekly schedules, specify the time in HH:MM format (for example, 08:00). For weekly, also select the days of the week (Mon, Tue, Wed, Thu, Fri, Sat, Sun).

5. Specify the timezone ​

Choose the timezone the run time is calculated against. By default this is the workspace timezone.

6. Configure missed-run behavior ​

Specify what to do if a run was missed (for example, due to an integration being disconnected):

  • Skip — don't catch up
  • Run at the first opportunity — execute once the connection is restored

7. Save ​

Click Save. The report will begin running automatically according to the schedule.

How to verify ​

  • After saving, a schedule indicator (a green clock icon) appears in the report list
  • Wait for the nearest scheduled run
  • Check the run history — a new entry with type Automatic should appear
  • Check the output sheet — the data should be updated

Important notes ​

  • The minimum interval between runs is 1 hour
  • If a run's scheduled time coincides with a run already in progress, the new run is queued
  • If the integration is disconnected, scheduled runs are skipped and marked Missed
  • The schedule can be disabled at any time without deleting the settings, using the toggle

Maintained by the LightLead Documentation Team · Last verified: 2026-07-25