Skip to content

Daily schedule ​

A daily schedule runs the report once a day at a user-defined time. It's the standard cadence for regular reporting.

How it works ​

  • The run happens every day at the specified time (for example, 08:00)
  • If the time has already passed on the day you enable it, the first run happens the next day
  • Example: you enable it at 10:00, with a run time of 08:00 — the first run will be tomorrow at 08:00

Step-by-step instructions ​

1. Open the schedule settings ​

In the builder or on the report page, go to the Schedule section.

2. Choose the frequency ​

Select Daily from the dropdown.

3. Set the run time ​

Set a time in HH:MM format (for example, 08:00). Recommendations:

  • 06:00-08:00 — yesterday's data has almost certainly finished updating in most sources
  • 00:01 — right after midnight, yesterday's data may still be incomplete
  • 09:00-10:00 — by the start of the workday, the data is definitely up to date

4. Configure the timezone ​

Set the timezone used to calculate the run time correctly.

5. Configure missed-run behavior ​

  • Skip — a missed run isn't caught up
  • Run at the first opportunity — run as soon as the connection is restored

6. Enable and save ​

Turn on the toggle and click Save.

Specifics ​

  • Frequency: 1 run per day
  • Run time: any, set by the user
  • Recommended write mode: Append (accumulation), Replace (full snapshot for the period), or SoftRefresh (if there are manual columns)
  • Recommended date range: yesterday — stable data for the full previous day
  • Shift on a missed run: if a run is missed and catch-up is enabled, it runs at the first opportunity, but doesn't shift the schedule. The next run still happens as scheduled

When to use it ​

  • Daily team reports (a morning digest)
  • Accumulating historical data (a new snapshot every day)
  • Daily KPI monitoring
  • Budget control (preventing overspend within a day)

When NOT to use it ​

  • You need data more than once a day — use an hourly schedule
  • Data updates less than once a day — a daily run is unnecessary
  • The report is only needed at the end of the week/month — use a weekly schedule or a manual run

Maintained by the LightLead Documentation Team · Last verified: 2026-07-25